Detailed text transcripts for TV channel - CNN - 20100701:17:49:00
Well bore, then they will attempt to move in and drill through the well bore and casing as well. at that point they'll be in a position to try to bottom-kill or insert the mud and hopefully of a that put a plug in to kill the well. development driller two is 6,720 feet below the sea floor and is making progress as well. our onshore and near-shore skimming and recovery operations have been significantly hampered by the weather. the small vessels that do the skimming have a difficult time operating out there. we had to pull them back. the same thing with the vessels operating around the well sit...