Latest Breaking News On - Ringing more 39 advanced and endurable equipment products to create values for customers builda better future society - Page 1 : vimarsana.com
Mumbai (Maharashtra) [India], December 15 (ANI/PRNewswire): The XGC150-IA crawler cranes of XCMG (SHE:000425) deployed to the construction project of Mumbai Trans Harbour Link ("MTHL") project, the longest cross-sea bridge in India that will connect Mumbai with its satellite city Navi Mumbai, delivered exceptional performance, significantly contributing to the development of the project. The Project has reported that it has finished 84 per cent of the construction and projects it will be completed by the end of 2023. The 21.8-kilometer bridge is constituted of a 16.5-kilometer bridge over the sea and 5.5-kilometer viaduct on land. Upon completion, the bridge will reduce the travelling time between Mumbai and Navi Mumbai from two hours to 20 minutes, accelerating transportation, logistics and economic activities significantly to promote local economic development. The MTHL project had strict requirements for the lifting capability, operation maneuverability and transportation