US Army says open system requirements clear for next-gen helicopter
Lockheed's future assault aircraft proposal lacked detail needed to validate its design had an open architecture at sub-system levels, the GAO found.
Stay updated with breaking news from Robert Barrie. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Lockheed's future assault aircraft proposal lacked detail needed to validate its design had an open architecture at sub-system levels, the GAO found.
Lockheed's future assault aircraft proposal lacked detail needed to validate its design had an open architecture at sub-system levels, the GAO found.
It's been roughly four years since the service put the brakes on buying the CH-47F Chinook Block II configuration, but a decision is expected this calendar year.
The Army chose the Bell-Textron bird based on a prototype, but an Army official predicted "very little" change for what soldiers will end up flying.
ITEP's delayed installation into future helicopter prototypes has had a ripple effect on the fleet set to be upgraded with the next-gen engine.