Saaka Bridge to save Mbale-Kampala motorists 60Kms, says Unra
The bridge, with an expected lifespan of 120 years, is being constructed at cost of Shs76.5 billion on River Mpologoma Swamp and stretches about 3.5kms
Source: monitor.co.ug
Stay updated with breaking news from Saaka Bridge. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The bridge, with an expected lifespan of 120 years, is being constructed at cost of Shs76.5 billion on River Mpologoma Swamp and stretches about 3.5kms