Gold production during the period was 20,622 oz. Overall, a total of 155,859 t of ore grading 4.5 g/t was mined from underground in Q4 compared with 156,391 t of ore grading 4.5 g/t in Q3. A further 44,691 t ore grading 1.4 g/t was mined from open pits in Q4 compared with 38,792 t of ore grading 2.16 g/t in Q3. 181,425 t of ore was milled during the period (Q3: 181,036 t). The ROM stockpile at the end of Q4 was 154,577 t of ore grading 1.31 g/t (up from 120,511 t grading 1.45 g/t at the end of Q3). Average recoveries of 90.4% were achieved in the plant during the period ...