Huisman Muscle for OIM Wind's Next-Gen Jack-Up
January 15, 2021, by Adnan Durakovic Huisman has signed a Letter of Intent with Yantai CIMC Raffles Offshore Ltd. for the delivery of a 2,600mt Leg Encircling Crane for OIM Wind’s BT-220IU Wind Installation Unit. Source: Huisman With its 140-metres-long boom and 2,600mt lifting capacity, this crane enables OIM Wind to install the next generation wind turbine generators and foundations safely and efficiently, Huisman said. The crane will have a main hook height of 165 metres above deck and 195 metres above sea level, even at the vessel’s maxim...
Source: offshorewind.biz