How ignored landslide warnings led to Subansiri running dry
On October 27, a spokesperson for the Subansiri Lower Project said the flow downstream was “highly reduced” — to an estimated 5-10 cubic metres per second (cumecs) — after a landslide “at about 11.30 am” blocked the only DT in use.
Source: indianexpress.com