Google's Topaz subsea cable will be the first to connect Asia and Canada
The subsea cable, expected to be finished in 2023, will run from Vancouver to Port Alberni and then across the Pacific Ocean to Mie and Ibaraki in Japan.
Stay updated with breaking news from Wavelength Selective Switch. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The subsea cable, expected to be finished in 2023, will run from Vancouver to Port Alberni and then across the Pacific Ocean to Mie and Ibaraki in Japan.
Message : Required fields TAINAN, Taiwan, May 19, 2021 (GLOBE NEWSWIRE) -- Himax Technologies, Inc. (Nasdaq: HIMX) (“Himax” or “Company”), a leading supplier and fabless manufacturer of display drivers and other semiconductor products, today unveils its latest liquid crystal on silicon (LCoS) technology, phase modulation LCoS, for two key application platforms, namely AR Head-Up Display (“AR HUD”) used as holographic display for automotive, and Wavelength Selective Switch (“WSS”) for Wavelength-Division Multiplexing (“WDM”) optical communications networks. AR HUD using h...
Key Findings of the Report: • The global LCOS based Wavelength Selective Switch (WSS) market forecast is studied from 2021 to 2027. • The research study includes a thorough analysis of the current research and clinical developments in the market globally. • The report presents a market definition along with the list of leading players and analyses their strategies to determine the competitive outlook of the market. • The report also studies the drivers, restraints, opportunities, and challenges of the global LCOS based Wavelength Selective Switch (WSS) market. • The study provides t...