தரையில் கணக்கெடுப்பு நடத்தப்பட்டது மூலம் லேசர் நுட்பம் மும்பை News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from தரையில் கணக்கெடுப்பு நடத்தப்பட்டது மூலம் லேசர் நுட்பம் மும்பை. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In தரையில் கணக்கெடுப்பு நடத்தப்பட்டது மூலம் லேசர் நுட்பம் மும்பை Today - Breaking & Trending Today

Mumbai-Nagpur High-Speed Rail Corridor: Aerial Ground Survey Conducted Through Laser Technique, GPS Data


Mumbai-Nagpur High-Speed Rail Corridor: Ground data was collected through the LiDAR survey
Mumbai-Nagpur High-Speed Rail Corridor: In order to conduct the ground survey for preparing the detailed project report (DPR) of the proposed Mumbai-Nagpur high-speed rail corridor, the light detection and ranging survey (LiDAR) was started on Friday, March 12, said the National High-Speed Rail Corporation Limited (NHSRCL). This was done to capture data related to ground survey for the 736 km long Mumbai-Nagpur rail corridor, where an airplane fitted with aerial LiDAR and imagery sensors took the first flight. (
The National High-Speed Rail Corporation Limited, entrusted with the task of implementing the bullet train project, is adopting the light detection and ranging survey technology as it provides all ground details and data in three-four months, whereas this process usually takes 10-12 months by traditional survey methods. ....

Uttar Pradesh , Ground Survey Conducted Through Laser Technique Mumbai , Speed Rail Corporation , National High , Speed Rail Corporation Limited , Mumbai Nagpur High Speed Corridor , Ground Survey Conducted Through Laser Technique , Mumbai Nagpur High Speed Rail Corridor , Nagpur High Speed Rail Corridor , National High Speed Rail Corporation Limited , Also Read , Delhi Varanasi High Speed Corridor , Laser Technique Adopted For Ground Survey , Detailed Project Report , Mumbai Nagpur , Khapri Deport , Malegaon Jahangir , Bullet Train In India , Bullet Train India , Bullet Train Between Mumbai And Ahmedabad , Mumbai Ahmedabad Bullet Train Project , உத்தர் பிரதேஷ் , தரையில் கணக்கெடுப்பு நடத்தப்பட்டது மூலம் லேசர் நுட்பம் மும்பை , வேகம் ரயில் நிறுவனம் , தேசிய உயர் , வேகம் ரயில் நிறுவனம் வரையறுக்கப்பட்டவை ,