வழக்கு ம்க்க்யாஂட்‌லெஸ்ஸ் News Today : Breaking News, Live Updates & Top Stories | Vimarsana

Stay updated with breaking news from வழக்கு ம்க்க்யாஂட்‌லெஸ்ஸ். Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Top News In வழக்கு ம்க்க்யாஂட்‌லெஸ்ஸ் Today - Breaking & Trending Today

Tethys Petroleum Announces Corporate | The Kingston Whig Standard


Tethys” or the “
We apologize, but this video has failed to load.
Try refreshing your browser.
Drilling Update
The AKD-12 well at Akkulka has been tested and has produced gas at a rate of approximately 29.4 thousand cubic meters per day using a 6mm choke, and approximately 34.5 thousand cubic meters per day using an 8mm choke. The interval perforated was 587.97-592.57 meters. The company is planning to complete the AKD-12 test and then contract this rig to spud the next well at Akkulka in mid-June. This new well will target the same shallow gas zone (approximately 600 meters). The AKD-12 well will not likely go into production until 2022. This well is in a new structure and will require new approvals as well as construction of a new pipeline to the well. The plan is to drill additional offset wells to AKD-12 to develop this new structure. ....

Casey Mccandless , Tethys Petroleum , Regulation Services Provider , Venture Exchange , Central Asia , வழக்கு ம்க்க்யாஂட்‌லெஸ்ஸ் , ஒழுங்குமுறை சேவைகள் வழங்குநர் , துணிகர பரிமாற்றம் , மைய ஆசியா ,

Tethys Petroleum Limited: Tethys Petroleum Interim Results


Tethys Petroleum Limited: Tethys Petroleum Interim Results
Grand Cayman, Cayman Islands (Newsfile Corp. - May 13, 2021) - Tethys Petroleum Limited
(TSXV: TPL) ( Tethys or the Company ) today announced that it has filed its Interim Results for the three months ended March 31, 2021. The full Interim Results together with Management s Discussion and Analysis have been filed with the Canadian securities regulatory authorities. Copies of the filed documents may be obtained via SEDAR at www.sedar.com or on Tethys website at www.tethys-group.com.
Operations update
Tethys is in the process of drilling KBD-03 and at last report was at a depth of 400 meters. In addition, Tethys will drill another well (KBD-06) offset to KBD-02. The rig/equipment for drilling KBD-06 has been delivered to the drill site and drilling is scheduled to begin on May 15 ....

Casey Mccandless , Tethys Petroleum Limited , Tethys Petroleum , Cayman Islands Newsfile Corp , Regulation Services Provider , Venture Exchange , Grand Cayman , Petroleum Limited , Interim Results , Central Asia , வழக்கு ம்க்க்யாஂட்‌லெஸ்ஸ் , ஒழுங்குமுறை சேவைகள் வழங்குநர் , துணிகர பரிமாற்றம் , மாபெரும் கேமன் , பெட்ரோலியம் வரையறுக்கப்பட்டவை , இடைக்கால முடிவுகள் , மைய ஆசியா ,