vimarsana.com

DUBAI, 19th January, 2022 (WAM) -- Dubai Electricity and Water Authority (DEWA) has announced that the work progress at the Hatta hydroelectric power plant reached 35 percent by the end of December 2021.

The plant’s production capacity is set to reach 250 megawatts (MW) with a storage capacity of 1,500 megawatt-hours and a lifespan of up to 80 years. This is the first of its kind in the Gulf region, with investments of around AED1.421 billion.

Turbines operated by the speed of the waterfall from...

Related Keywords

Dubai ,Dubayy ,United Arab Emirates ,Saeed Mohammed Al ,Rashid Al Maktoum ,Dubai Clean Energy Strategy ,Water Authority ,Mohammed Al Tayer ,Roller Compacted Concrete ,His Highness Sheikh Mohammed ,Vice President ,Prime Minister ,Dubai Net Zero Emissions Strategy ,Concentrated Solar Power ,Dubai Mountain Peak ,Hatta Sustainable ,Business ,Renewable Energy ,

© 2024 Vimarsana

vimarsana.com © 2020. All Rights Reserved.