vimarsana.com


-
South Gippsland Highway will be closed for 22 days as part of the finishing touches of a level-crossing removal project at Dandenong South.
During the three-week “blitz”, construction crews will connect a new road bridge and the Princes Highway intersection.
South Gippsland Highway will be closed between Dandenong Bypass and Princes Highway from 9pm Friday 16 July to 5am Friday 6 August.
Detours will direct traffic via Dandenong Bypass and Frankston-Dandenong Road.
Metropolitan Roads Program Alliance Project Director Andrew Pepplinkhouse said the road closure was a necessary inconvenience.
“Once these works are complete the new road bridge will make the level crossing a thing of the past, easing congestion for road users and providing safer cycling and pedestrian links through the area and thousands of new trees and shrubs.”

Related Keywords

Dandenong ,Victoria ,Australia ,Cranbourne ,Andrew Pepplinkhouse ,Gabrielle Williams ,Program Alliance ,Gippsland Highway ,Princes Highway ,Dandenong Bypass ,Metro Tunnel Project ,டேன்டெனோங் ,விக்டோரியா ,ஆஸ்திரேலியா ,கிரான்போர்ன் ,கேப்ரியல் வில்லியம்ஸ் ,ப்ரோக்ர்யாம் கூட்டணி ,கிப்ஸ்லேண்ட் நெடுஞ்சாலை ,ப்ரிந்ஸஸ் நெடுஞ்சாலை ,டேன்டெனோங் பைபாஸ் ,மெட்ரோ சுரங்கம் ப்ராஜெக்ட் ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.