Intervals reported are core lengths with true width estimated to be 75 - 85%
Length-weighted averages from uncut assays
The drill results at Nyam focused on further testing the southern portion of the Nyam Gold Deposit, with a series of holes targeting the near surface oxide zone and the shallow portion of the underlying sulphide mineralization along a 300-metre portion of the structure. Hole NBRC053, drilled in an area where prior holes were spaced more than 100 metres apart, intersected multiple gold mineralized structures with results including 1.32 g/t Au over 9.0 m from 48 m to 57 m in the upper portion of the sulphide zone, and 0.86 g/t Au over 2.0 m from 9 m to 11 m in the oxide zone. Hole NBRC050, collared 150 metres north of NBRC053, intersected a series of gold mineralized structures all within the oxide zone with results including 1.23 g/t Au over 2.0 m from 11 m to 13 m, 1.03 g/t Au over 4.0 m from 23 m to 27 m, and 0.67 g/t Au over 10.0 m from 35 m to 45 m. Hole NBRC051, collared 50 metres to the south of NBRC050, also intersected three gold-bearing structures with results including 0.99 g/t Au over 3.0 m from 28 m to 31 m in oxides, 0.69 g/t Au over 9.0 m from 38 m to 47 m in the upper sulphide zone and 0.51 g/t Au over 8.0 m from 57 m to 65 m in the sulphide zone.