The reactor pressure vessel has been hoisted into place at unit 2 of the Zhangzhou nuclear power plant in China's Fujian province. Zhangzhou 2 is the second of two Hualong One units being built at the site, scheduled to enter commercial operation in 2024 and 2025, respectively.