vimarsana.com


The state agency said project is within expansions considered by its original 45-year-old review.
6:10 pm, Jun. 30, 2021
×
An aerial view looking southeast at Cleveland-Cliffs’ Milepost 7 tailings basin. The area in the foreground is where the expansion would take place. (Clint Austin / 2020 file / caustin@duluthnews.com)
Minnesota regulators said Northshore Mining's planned 650-acre tailings basin expansion doesn't require an environmental review and awarded the project a key water permit this week.
In a 68-page environmental review of need determination, the Minnesota Department of Natural Resources on Monday said because the project was within the maximum size considered in the 1975-1976 environmental impact statement, or EIS, it prepared with the Minnesota Pollution Control Agency, a new environmental assessment worksheet and supplement to its EIS were not needed.

Related Keywords

Minnesota ,United States ,Silver Bay ,Jess Richards ,Paula Maccabee ,Minnesota Department Of Natural Resources On ,Minnesota Pollution Control Agency ,National Environmental Policy ,Us Army Corps Of Engineers ,Minnesota Department ,Natural Resources ,Reserve Mining ,Lake Superior ,News Tribune ,Commissioner Jess Richards ,Minnesota Environmental Protection Act ,National Environmental Policy Act ,Permit Amendment ,Mile Post ,மினசோட்டா ,ஒன்றுபட்டது மாநிலங்களில் ,வெள்ளி வளைகுடா ,ஜெஸ் ரிச்சர்ட்ஸ் ,மினசோட்டா துறை ஆஃப் இயற்கை வளங்கள் ஆன் ,தேசிய சுற்றுச்சூழல் பாலிஸீ ,எங்களுக்கு இராணுவம் கார்ப்ஸ் ஆஃப் பொறியாளர்கள் ,மினசோட்டா துறை ,இயற்கை வளங்கள் ,இருப்பு சுரங்க ,ஏரி உயர்ந்தது ,செய்தி ட்ரிப்யூன் ,ஆணையர் ஜெஸ் ரிச்சர்ட்ஸ் ,மினசோட்டா சுற்றுச்சூழல் ப்ரொடெக்ஶந் நாடகம் ,தேசிய சுற்றுச்சூழல் பாலிஸீ நாடகம் ,அனுமதி திருத்தம் ,மைல் போஸ்ட் ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.