vimarsana.com


Sarjeant Gallery: Checks on historic building's movement proves solid design
2 Mar, 2021 04:00 PM
3 minutes to read
A new concrete retaining wall installed behind the Sarjeant Gallery prevents subsidence during construction of the extension wing. Photo / Supplied
Whanganui Chronicle
By: Project Director Gaye Batty
Systems are in place and regular checks show no significant movement of Whanganui's 100-year-old Sarjeant Gallery, now in the full swing of redevelopment.
The Sarjeant Gallery redevelopment project involves earthquake-strengthening of the existing heritage building and construction of a new wing – Pataka o Sir Te Atawhai Archie John Taiaroa, named in honour of the much loved Whanganui kaumātua.

Related Keywords

North Island ,New Zealand General ,New Zealand ,Whanganui ,Atawhai Archie John Taiaroa ,Harrison Osullivan , ,Sarjeant Gallery ,Sir Te Atawhai Archie John Taiaroa ,Central North Island ,Clendon Burns ,Sarjeant ,Gallery ,Checks ,Historic ,Buildings ,Movement ,Aproves ,Solid ,Design ,Systems ,Place ,Regular ,Show ,Significant ,Whanganuis ,100yearold ,Full ,Swing ,Redevelopment ,வடக்கு தீவு ,புதியது ஜீலாந்து ஜநரல் ,புதியது ஜீலாந்து ,ஹாரிசன் ஓசுள்ளிவண் ,மைய வடக்கு தீவு ,கிளெண்டன் தீக்காயங்கள் ,கேலரி ,காசோலைகள் ,வரலாற்று ,கட்டிடங்கள் ,இயக்கம் ,நிரூபிக்கிறது ,திட ,வடிவமைப்பு ,அமைப்புகள் ,இடம் ,வழக்கமான ,காட்டு ,குறிப்பிடத்தக்க ,முழு ,ஸ்விங் ,மறுவடிவமைப்பு ,

© 2025 Vimarsana

vimarsana.com © 2020. All Rights Reserved.