vimarsana.com


TNERC rejects plea by two solar developers for extension of project deadline
Updated:
Updated:
February 16, 2021 01:23 IST
Raasi Green Earth Energy Private Limited and VSR Solar Power Private Limited had sought extension of the commencing date by 15 months and 18 months respectively.
Share Article
AAA
Raasi Green Earth Energy Private Limited and VSR Solar Power Private Limited had sought extension of the commencing date by 15 months and 18 months respectively.
The Tamil Nadu Electricity Regulatory Commission (TNERC) has rejected separate pleas by two solar energy developers for extension of commissioning date for their solar projects.
Raasi Green Earth Energy Private Limited and VSR Solar Power Private Limited had sought extension of the commencing date by 15 months and 18 months respectively.

Related Keywords

Thoothukudi ,Tamil Nadu ,India ,China ,Taiwan ,Malaysia ,Ramanathapuram , ,Solar Power Private ,Tamil Nadu Electricity Regulatory Commission ,Raasi Green Earth Energy Private ,Green Earth Energy Private Limited ,Power Private Limited ,Tnerc ,Rejects ,Plea ,Solar Developers ,Extension ,Project Deadline ,Raasi Green Earth Energy Private Limited ,Vsr Solar Power Private Limited ,தூத்துக்குடி ,தமிழ் நாடு ,இந்தியா ,சீனா ,டைவாந் ,மலேசியா ,ரமநாதபுரம் ,சூரிய பவர் ப்ரைவேட் ,தமிழ் நாடு மின்சாரம் ஒழுங்குமுறை தரகு ,ராசி பச்சை பூமி ஆற்றல் ப்ரைவேட் ,பச்சை பூமி ஆற்றல் ப்ரைவேட் வரையறுக்கப்பட்டவை ,பவர் ப்ரைவேட் வரையறுக்கப்பட்டவை ,நிராகரிக்கிறது ,ப்லீ ,சூரிய டெவலப்பர்கள் ,நீட்டிப்பு ,ப்ராஜெக்ட் காலக்கெடுவை ,ராசி பச்சை பூமி ஆற்றல் ப்ரைவேட் வரையறுக்கப்பட்டவை ,வ்ஸ்ர் சூரிய பவர் ப்ரைவேட் வரையறுக்கப்பட்டவை ,