• The integration maximizes the efficiency of downloading past building load data directly from the utility, which gives engineers a more accurate view of past usage and peak requirements of their project.
• The more exact the interval load data, the more precise the model, as the number of assumptions made during the optimization can be greatly reduced.
• The integration reduces engineering hours through programmatically loading data, ensuring that the solution will be more tailored to the needs of the building.