📰 Combined Construction News
Combined Construction News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Combined Construction. Real-time updates on events, politics, business and more.
October 31, 2023
Talladega College kicked off Founders Week Monday by packing the student center ballroom with a couple of hundred of Talladega’s most influential people from every walk of life for the
September 17, 2023
One of the interesting items we have this week is a study by Greenpeace in which various organisms from the sea near Fukushima were sampled for radioactive isotopes. Let's take a closer look. The data in the table provided (see the first item in Ana's feed for the link) show the amount of radiation (radioactive decay) by isotope type per kilogram of plant or animal tissue from various samples. On the higher end is a fish with 357 bq/kg of radiation and some seaweed with 190 bk/kg.
August 12, 2023
The houses will be targeted to young couples just starting out, senior citizens and retirees looking to downsize and the deaf and blind community.
July 26, 2023
The Lewis and Clark Bridge is fully reopened after maintenance crews replaced two of the bridge’s three expansion joints and a fractured floor beam during a four-day closure.
July 21, 2023
The Lewis and Clark Bridge re-opened to all traffic at 5 p.m. Thursdayafter crews completed repairs to the 1930 span across the Columbia River between Rainier and Longview, Washington. During
July 20, 2023
No pedestrian, bicycle or ambulance access for 10-hour window of closure Travelers using State Route 433 between Longview and Rainier, Oregon, will
July 19, 2023
The Lewis and Clark Bridge was set to close July 16 for eight days while repairs are conducted to the structure that connects Oregon to Washington at Rainier on the
July 17, 2023
The Lewis and Clark Bridge was set to close July 16 for eight days while repairs are conducted to the structure that connects Oregon to Washington at Rainier on the
July 15, 2023
Beginning in the fall of 2022, the bridge construction project’s second phase finished ahead of schedule.
July 6, 2023
PORTLAND, Ore. -- Beginning Sunday, July 16, the Lewis and Clark Bridge will close for up to eight days as crews make repairs to the 93-year-old structure