📰 Emsworth Locks News
Emsworth Locks News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Emsworth Locks. Real-time updates on events, politics, business and more.
May 20, 2024
Two barges that were lodged against Emsworth Dam have been removed, but high water is still pinning one barge against Dashields Dam.
May 4, 2024
Three barges remain pinned against two Upper Ohio River dams in the Pittsburgh Engineer District, but a sunken one has been removed.
April 19, 2024
Barges remained pinned against both Emsworth and Dashields locks and dams nearly a week after a 26-barge breakaway on the upper Ohio River.
December 15, 2023
Imagine a football field laid with concrete end zone to end zone, poured and formed 10 feet thick — just enough to cover the crossbar of a goalpost.
December 15, 2023
The Waterways Journal takes its annual look back at the major events that made news on the waterways in the last year.
November 3, 2023
Imagine a football field laid with concrete end zone to end zone, poured and formed 10 feet thick — just enough to cover the crossbar of a goalpost.
October 30, 2023
Imagine a football field laid with concrete end zone to end zone, poured and formed 10 feet thick — just enough to cover the crossbar of a goalpost.
October 22, 2023
Imagine a football field laid with concrete end zone to end zone, poured and formed 10 feet thick — just enough to cover the crossbar of a goalpost.
October 21, 2023
As of early August, the hallmark legislation of the Biden administration resulted in 289 infrastructure projects announced across the commonwealth funded at a combined $10.2 billion, with billions more expected.
August 18, 2023
Stressing the need for efficient funding for lock construction, WCI hosted members of the media on a tour of Pittsburgh area projects.