📰 Hydro Testing News
Hydro Testing News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Hydro Testing. Real-time updates on events, politics, business and more.
October 27, 2022
The Texas Department of Licensing and Regulation has found the boiler at Nueces County to be out of compliance.
July 21, 2021
ISGEC Heavy Engineering jumps on bagging significant order for soda ash project from Russia ISGEC Heavy Engineering is currently trading at Rs. 796.30, up by 9.15 points or 1.16% from its previous closing of Rs. 787.15 on the BSE. The scrip opened at Rs. 786.95 and has touched a high and low of Rs. 823.40 and Rs. 765.15 respectively. So far 35244 shares were traded on the counter. The BSE group ‘A’ stock of face value Rs. 1 has touched a 52 week high of Rs. 877.00 on 05-Jul-2021 and a 52 we...
April 26, 2021
Message : Required fields ATLANTA, April 26, 2021 /PRNewswire/ -- All modules for Georgia Powers Vogtle 3 & 4 nuclear expansion project near Waynesboro, Georgia, have now been set as a massive water tank has been lifted into place atop the Unit 4 containment vessel and shield building roof. The placement also represents the last major crane lift at the project site. The Passive Containment Cooling Water Storage Tank, known as CB-20, is a major part of the AP1000 reactors advanced passive safet...
December 14, 2020
Georgia Power completes Condenser Vacuum Testing on Vogtle Unit 3 Verifies Unit 3 turbine system is ready for last major test, Hot Functional Testing, ahead of fuel load News provided by Share this article Share this article ATLANTA, Dec. 14, 2020 /PRNewswire/ -- Georgia Power today announced the completion of the pre-operational condenser vacuum test of the Vogtle Unit 3 turbine system. The milestone marks another step for the Vogtle 3 & 4 nuclear expansion project towards operations and prov...