The SISGES project is a two-phase development that will monetise more than 10 trillion ft3 of gas discoveries with high contaminants, off the coast of Sarawak.
BINTULU (Sept 21): Sarawak Shell Berhad (SSB), a subsidiary of Shell plc, marked the start of the onshore plant development for the Rosmari-Marjoram project, the first phase of Sarawak Integrated Sour Gas Evacuation System (Sisges), with a ground-breaking event in Bintulu today.
The ceremony was
Malaysia ranked as the world’s fifth-largest LNG exporter last year but maintaining this position will require it to tap vast but costly and technically challenging sour gas fields in the South China Sea. [Gas in Transition, Volume 3, Issue 7]
MANILA (Philippine Daily Inquirer/Asia News Network): The delivery of natural gas from the Malampaya offshore field to key power plants in Luzon resumed last Feb 19, according to its operator.