Saaka Bridge to save Mbale-Kampala motorists 60Kms, says Unra
The bridge, with an expected lifespan of 120 years, is being constructed at cost of Shs76.5 billion on River Mpologoma Swamp and stretches about 3.5kms
Uganda General Pallisa District Lawrence Onyu Saaka Bridge River Mpologoma Swamp River Mpologoma Swamp
Source: monitor.co.ug