KL City Hall outlines interim measures to tackle flash floods in the city
UPGRADING scupper drains, constructing new sump pumps, placing sandbags and desilting debris at flood retention ponds in 25 flood hotspots in the city are all part of interim measures taken by Kuala Lumpur City Hall (DBKL) to tackle the flash flood problem in Kuala Lumpur.
Source: thestar.com.my