๐ฐ Segomoco Scheppers News
Page 2 - Segomoco Scheppers News Today
Fast, Ad-Free News Updates
Stay updated with breaking news from Segomoco Scheppers. Real-time updates on events, politics, business and more.
October 1, 2023
Eskom had previously announced that Stage 2 load shedding would be implemented from 16:00 on Sunday. Rolling blackouts have been suspended.
September 30, 2023
Eskom had previously announced that Stage 2 load shedding would be implemented from 16:00 on Saturday. Rolling blackouts have been suspended.
September 28, 2023
Eskom aims to keep load shedding as low as possible, with the aim of not exceeding Stage 4.
September 28, 2023
Eskom issued a statement stating, South Africans ought to expect low levels of load shedding toward the end of the year and early 2024.
September 27, 2023
Eskom's acting group CEO Calib Cassim remains tight-lipped on the appointment of a permanent candidate nearly seven months after Andrรฉ de Ruyter's dramatic exit.
September 27, 2023
Eskom says it hopes to contain load-shedding at stage 4 during summer and is banking on achieving this by keeping the unplanned capacity loss factor around 14,500MW.
July 31, 2023
Uncertainty around licensing for the transmission unit is delaying access to the funding needed to strengthen the grid.
July 30, 2023
Nersa approves only one of three licences.
June 27, 2023
By the early 2030s, our energy system will be unrecognisable compared with the present.
May 30, 2023
Eskom’s Transmission Division, which will form part of the separated National Transmission Company South Africa once established later this year, will begin relying more heavily on the engineer, procure and construct (EPC) contracting model as it seeks to accelerate the pace at which transmission infrastructure is built in a context where the lack of grid has become a key impediment to the injection of new generation capacity. In an address to suppliers, MD Segomoco Scheppers reported that...