vimarsana.com

Page 9 - மெட்ரோ பெஸிஃபிக் முதலீடுகள் கார்ப் News Today : Breaking News, Live Updates & Top Stories | Vimarsana

MVP says Metro Pacific is eyeing local manufacture of COVID-19 vaccine

PXP unit launches case vs Australia s Karoon Energy

BusinessWorld May 26, 2021 | 12:05 am The block is situated in the Tumbes Basin offshore Northwest Peru. In its disclosure, Manuel V. Pangilinan-led PXP said that Karoon Energy’s unit KEI Sucursal del Peru, the operator of the block, was supposed to drill a second well during the third exploration phase, as stated in its contract. If the well is not drilled during this time, KEI must continue drilling activities until the fourth period of the exploration phase. KEI is also required to pay Pitkin’s participating interest of 25% in all expenses incurred until the second well is completed. “KEI is in breach of its obligations to Pitkin by not entering into the [fourth exploration phase],” PXP said.

Philippines signs new deal with water utility after Duterte criticism

Traffic expected as NLEX starts bridge repairs

BusinessWorld May 21, 2021 | 8:25 pm NLEX Harbor Link, Segment 10 PHOTO BY WALTER BOLLOZOS/THE PHILIPPINE STAR Motorists may experience delays as NLEX Corp. has started repairs on Meycauayan and Bigaa bridges in Bulacan province, both built in the 1960s, the company’s top official said on Thursday.  In an e-mailed statement, the tollway company said the bridge rehabilitation projects seek to provide safer travel.  “We always look after the safety and convenience of our motorists. Both bridges were built in the 1960s and it is high time that we replace the girders and slabs to strengthen the structures,” NLEX Corp. President and General Manager J. Luigi L. Bautista said. 

© 2025 Vimarsana

vimarsana © 2020. All Rights Reserved.