The trial revealed the process took even less time than initially thought. Fitzroy River Water manager Dr Jason Plumb said he was very happy with the trial. “We have successfully trialed the delivery of drinking water from Gracemere, up the Razorback, and safely through the township of Mount Morgan,” Dr Plumb said. Fitzroy River Water manager Jason Plumb. Picture: Contributed “We are just finishing pumping and unloading about 25,000 litres of drinking water into the storage reservoir behind me. “It’s been quite successful, and we are very confident we will be able to meet demand as required in the future.”