ALDOT plans permanent repairs to hole in bridge on I-59 : vi

ALDOT plans permanent repairs to hole in bridge on I-59


BIRMINGHAM — On Friday, June 11
th at 8 p.m., weather permitting, the Alabama Department of Transportation will begin scheduled Concrete Bridge Deck repairs on the I-59 northbound and southbound bridges over Edwards Lake Road in Jefferson County as follows:
The outside (right) shoulder of I-59 northbound over Edwards Lake Road (Milepost 137.4).
The inside (left) lane of the northbound I-459 ramp to I-59 northbound.
The outside (right) lane of I-59 southbound over Edwards Lake Road. (Milepost 137.4).
All traffic lanes will be re-opened no later than 5 a.m. Monday, June 14
th.
Motorists are requested to consider using alternate routes, adjust arrival/departure times, observe work zone speed limits and other work zone signs, and use extreme caution in this area. ALDOT thanks motorists for their patience during this maintenance operation to improve Alabama’s roadways.

Related Keywords

Alabama , United States , Jefferson County , , Alabama Department Of Transportation , From The Tribune , Alabama Department , Concrete Bridge Deck , Edwards Lake Road , Edwards Lake , அலபாமா , ஒன்றுபட்டது மாநிலங்களில் , ஜெஃபர்சன் கவுண்டி , அலபாமா துறை ஆஃப் போக்குவரத்து , இருந்து தி ட்ரிப்யூன் , அலபாமா துறை , எட்வர்ட்ஸ் ஏரி சாலை , எட்வர்ட்ஸ் ஏரி ,

© 2025 Vimarsana