National May 25, 2021 ISLAMABAD: A special audit of the aborted Rawalpindi Ring Road (R3) project has been ordered, which will run parallel to the inquiries being simultaneously conducted by the National Accountability Bureau (NAB) and the Anti-Corruption Establishment (ACE) of Punjab. A letter issued by the Directorate of Audit Works (Provincial), Lahore, a copy of which was provided to The News by a source, has requisitioned the record relating to the R3 project from the Rawalpindi commissioner/project director. The letter asked the commissioner to attach with the audit team a focal person not below the rank of grade-17 for the early production of the record and smooth working during the period of the special audit.