OWNER: 210 SE Madison OZ LLC DEVELOPER: Libertas Management CONTRACTOR: Truebeck Construction ENGINEERS: Grummel Engineering LLC (structural), AKS Engineering & Forestry (civil), American Heating Inc. (design-build HVAC, plumbing), Christenson Electric Inc. (electrical design-build), Geopacific Engineering Inc. (geotech) SIGNIFICANCE OF PROJECT: The project continues the modernization of the Central Eastside Industrial District while maintaining its working-class roots. Two 1920s-era warehouses are being integrated into a single multilevel, multi-tenant building. Construction is taking place in phases amid partial occupancy. The building will feature an exposed timber and steel structural system, an open social stair at a shared, open common area, exposed steel and wood stair systems, murals by local artists, a central light monitor that will flood common areas with natural light, and upgraded (for current energy code) envelope and mechanical systems. There will be new energy-efficient windows throughout the structure. Salvaged and reclaimed materials are being incorporated. One of the original buildings (both were constructed before the Hawthorne Bridge’s on-ramps) formerly was a Miller Paint warehouse. The combined new building will have high-beam ceilings, an elevator, and open and collaborative spaces. Spaces will range from small to large (more than 10,000 square feet).