Carnavale Resources' aircore drilling at Kookynie Project zeros in on high-grade gold targets The third phase of aircore drilling has been designed to infill areas of identified gold anomalism at McTavish East, McTavish North and Champion South that contain high-grade gold intercepts. Bostech Drill rig at the Kookynie Gold Project Carnavale Resources Ltd (ASX:CAV) (FRA:YBB) has commenced the third phase of aircore drilling of 7,300 metres at the Kookynie Gold Project, targeting the high-grade gold targets identified in the March 2021 drilling program. Previous aircore drilling identified high-grade, structurally controlled gold mineralisation in regolith, undercover at McTavish East with high-grade intercepts including: