Carnavale Resources wraps up Phase 3 aircore drilling on exploration fast-track at Kookynie Gold Project The program was designed to infill and extend the high-grade anomalies outlined in previous drilling in December 2020 and March 2021. The first assay results will be reported towards the end of June 2021. Carnavale Resources Ltd (ASX:CAV) (FRA:YBB) has successfully completed its third aircore drilling program of 135 holes for 7,432 metres at the Kookynie Gold Project 60 kilometres south of Leonora in the Western Australian Goldfields. The program was designed to infill previous high-grade intercepts to provide targets for RC drilling and test the extents and potential of the structural features in the weathered profile identified in earlier drilling completed in December 2020 and March 2021.