Clockwise Chester: Nuns Road to shut for remainder of the ye

Clockwise Chester: Nuns Road to shut for remainder of the year | Chester and District Standard


A CITY centre road will close at the end of the month and not reopen for the remainder of the year due to the ongoing Chester Clockwise scheme.
Nuns Road is to shut on Monday, March 29 as part of the current works in the city to install a new surface rainwater drain.
The closure is currently expected to last until January 2022 to allow for construction and operation of a drainage tunnel shaft at the Grosvenor Road junction.
As a result, only emergency vehicles will have access to this junction for safety reasons.
Access-only routes to Blackfriars, Nuns Road properties, Roomzzz Aparthotel and from the HQ Building/Abode Hotel car park exit will remain open to and from the Watergate Street direction only.

Related Keywords

Blackfriars , London , City Of , United Kingdom , Roomzzz Aparthotel , Hq Building Abode Hotel , Grosvenor Road , Nuns Road , Abode Hotel , Watergate Street , , பிளாக்ஃப்ரியர்கள் , லண்டன் , நகரம் ஆஃப் , ஒன்றுபட்டது கிஂக்டம் , ஹ்க் கட்டிடம் அேக ஹோட்டல் , க்ராவ்நர் சாலை , கன்னியாஸ்திரிகள் சாலை , அேக ஹோட்டல் , வாட்டர்கேட் தெரு ,

© 2025 Vimarsana