In a flyer published by the Department, it collected neutral and positive feedback to the stage 6, 1.2km stretch from Alexandra Headland to Maroochydore. In the summary of feedback the Department noted 55 per cent of feedback had been neutral or positive about the preferred design, despite a graph in the flyer showing a breakdown of the figures. A snapshot of stage six of the M2M Cycleway, connecting coastal areas of the Sunshine Coast. Of the 1159 pieces of project feedback only 260 were positive, while 375 were neutral and 524 were negative. "The feedback categorised as 'neutral' included inquiries and general suggestions that did not demonstrate opposition to the project," a Department of Transport and Main Roads spokesman said.