Work improving a flood-prone section of N.C. 12 in Duck that began in October and continues to May shifted to a 24/7 schedule Sunday through Jan. 28. The project will raise the road above the 100-year floodplain, improve stormwater drainage and restore the living shoreline along a stretch of roadway by the Currituck Sound.