Punch Newspapers Sections Published 31 January 2021 The Federal Controller of Works, Lagos, Mr Olukayode Popoola, on Sunday, said that the total shutdown of the Third Mainland Bridge would be lifted at midnight of January 31, 24 hours ahead of schedule. Popoola told the News Agency of Nigeria on the telephone that the contractor was able to complete the repair works on the bridge on Saturday, hence the lifting of the total closure at midnight. “The casting of the expansion joints was completed on Saturday. Therefore, the Third Mainland Bridge will be opened by 12 midnight of January 31. “Motorists can start plying the bridge as from 12 midnight,” he said.