FG reopens Third Mainland Bridge ahead of schedule : vimarsa

FG reopens Third Mainland Bridge ahead of schedule


The Federal Controller of Works, Lagos, Mr Olukayode Popoola, on Sunday, said that the total shutdown of the Third Mainland Bridge would be lifted at midnight of Jan. 31, 24 hours ahead of schedule.
Popoola told the News Agency of Nigeria (NAN) on the telephone that the contractor was able to complete the repair works on the bridge on Saturday, hence the lifting of the total closure at midnight.
“The casting of the expansion joints was completed on Saturday. Therefore, the Third Mainland Bridge will be opened by 12 midnight of Jan. 31.
“Motorists can start plying the bridge as from 12 midnight,” he said.

Related Keywords

Lagos , Nigeria , Cairo , Al Qahirah , Egypt , Oworonsoki , Lagos State , Oworonshoki , Ibadan , Oyo , Lagos Island , Olukayode Popoola , Adeniji , Adeniji Adele , News Agency Of Nigeria , Federal Controller , Third Mainland Bridge , News Agency , லாகோஸ் , நைஜீரியா , கெய்ரோ , எகிப்து , லாகோஸ் நிலை , ஓயோ , லாகோஸ் தீவு , கூட்டாட்சியின் கட்டுப்படுத்தி , மூன்றாவது பிரதான நிலப்பரப்பு பாலம் ,

© 2025 Vimarsana