Highway closed for bridge works | Dandenong Star Journal : v

Highway closed for bridge works | Dandenong Star Journal


-
South Gippsland Highway will be closed for 22 days as part of the finishing touches of a level-crossing removal project at Dandenong South.
During the three-week “blitz”, construction crews will connect a new road bridge and the Princes Highway intersection.
South Gippsland Highway will be closed between Dandenong Bypass and Princes Highway from 9pm Friday 16 July to 5am Friday 6 August.
Detours will direct traffic via Dandenong Bypass and Frankston-Dandenong Road.
Metropolitan Roads Program Alliance Project Director Andrew Pepplinkhouse said the road closure was a necessary inconvenience.
“Once these works are complete the new road bridge will make the level crossing a thing of the past, easing congestion for road users and providing safer cycling and pedestrian links through the area and thousands of new trees and shrubs.”

Related Keywords

Dandenong , Victoria , Australia , Cranbourne , Andrew Pepplinkhouse , Gabrielle Williams , Program Alliance , Gippsland Highway , Princes Highway , Dandenong Bypass , Metro Tunnel Project , டேன்டெனோங் , விக்டோரியா , ஆஸ்திரேலியா , கிரான்போர்ன் , கேப்ரியல் வில்லியம்ஸ் , ப்ரோக்ர்யாம் கூட்டணி , கிப்ஸ்லேண்ட் நெடுஞ்சாலை , ப்ரிந்ஸஸ் நெடுஞ்சாலை , டேன்டெனோங் பைபாஸ் , மெட்ரோ சுரங்கம் ப்ராஜெக்ட் ,

© 2025 Vimarsana