http://shet.news/jid82 Copied! SHETLAND doesnât do small. When Sullom Voe Terminal was at full production in the 1980s it was the largest oil export terminal in Europe. Twenty years later, plans were drawn up for the largest and most productive onshore wind farm in Europe. With that particular wind farm in the early stages of being built, the next mega project emerges over the horizon. And this time it is not just big – it also has the calibre of being âtransformationalâ and promises to launch Shetland into the net-zero era, albeit on a massive industrial level. 13 of 14Adverts