New drawings show vision for Ely school project : vimarsana.

New drawings show vision for Ely school project


Keith Vandervort
ELY – School Board members here met in a study session Monday night to discuss various updates on design, financing, and construction involving the district’s $20 million facility renovation project.
Architects presented numerous full-color, three-dimensional drawings as well as an animated tour of the new construction that will connect the Memorial and Washington school buildings.
Karl Larsen, principal architect for Architectural Resources, Inc., updated the board on the two phases of the project. The first phase involves design and construction of the new addition that will connect the campus buildings. The second phase involves renovations, reuse and updating of both existing buildings.

Related Keywords

Washington , United States , Erik Erie , Karl Larsen , Keith Vandervort , Jodie Zesbaugh , Kraus Anderson , Architectural Resources Inc , School Board , Architectural Resources , Obligation Facilities Maintenance , Ehlers Public Finance , Industrial Arts , வாஷிங்டன் , ஒன்றுபட்டது மாநிலங்களில் , ஏறிக் இரீ , கார்ல் லார்சன் , க்ராஸ் ஆண்டர்சன் , கட்டடக்கலை வளங்கள் இன்க் , பள்ளி பலகை , கட்டடக்கலை வளங்கள் , எலர்ஸ் பொது நிதி , தொழில்துறை கலைகள் ,

© 2025 Vimarsana