North Sea Terminal Bremerhaven (NTB) prepared for the future

North Sea Terminal Bremerhaven (NTB) prepared for the future with the four new Liebherr ship to shore (STS) container cranes


Home / Shipping News / Port News / North Sea Terminal Bremerhaven (NTB) prepared for the future with the four new Liebherr ship to shore (STS) container cranes
North Sea Terminal Bremerhaven (NTB) prepared for the future with the four new Liebherr ship to shore (STS) container cranes
NTB in Bremerhaven has taken delivery of four additional Liebherr ship to shore container cranes. It brings to ten the number of Liebherr STS at the port since the first STS was handed over in 2018. The cranes are identical to the previous supplied and are amongst the largest STS cranes in the world with an outreach of 73 m, a span of 30.48 m and a backreach of 25 m. The cranes have a safe working load of 75 tonnes and are able to handle the world’s largest container vessels. Designed to work vessels with 25 containers across and up to 10 high on deck, the cranes will allow NTB to handle future generations of ultra large container vessels.

Related Keywords

David Griffin , Christian Lankenau , Liebherr Group , Automation Systems , Three Liebherr , Managing Director , Liebherr Container Cranes , டேவிட் கிரிஃபின் , கிறிஸ்துவர் லான்கேனௌ , பொய்யர் குழு , ஆட்டோமேஷன் அமைப்புகள் , மூன்று பொய்யர் , நிர்வகித்தல் இயக்குனர் , பொய்யர் கொள்கலன் கிரேன்கள் ,

© 2025 Vimarsana