NOTICE TO CONTRACTORS The North Dakota Department of Transportation (NDDOT) will receive bids for the construction of the following project(s): Job No.: 22254 Project No(s).: NH-5-085(077)074 & HEN-5-085(081)073 Length: 0.969 Type: WIDENING, SURFACING, LIGHTING, SEAL COATS, TURN LANE AND INCIDENTALS County(s): STARK Co Location: US 85, NEAR 4TH AVE E N TO I-94 - BELFIELD & US 85, JCT US 85 & 38TH ST SW (CMC 4512) 1 MI S OF BELFIELD Job No.: 23165 Project No(s).: SU-CVD-5-983(066) Length: 0.323 Type: EXCAVATION, PCC PAVEMENT, VALLEY GUTTER, CURB & GUTTER, ADA CURB RAMPS, SIDEWALK, DRIVEWAY, SIGNING AND LIGHTING County(s): STARK Co Location: 4TH AVE E, 21ST ST E N TO 26TH ST E - DICKINSON Job No.: 23340 Project No(s).: ARP-HEN-5-085(083)075 Length: 69.798 Type: SIGNING, PAVEMENT MARKINGS, DELINEATORS, CHANGEABLE MESSAGE SIGNS County(s): STARK, BILLINGS, & MCKENZIE Cos Location: US 85, JCT I-94 N TO JCT US 85B W OF WATFORD CITY (US 85 SAFETY CORRIDOR) Bids will be received via the Bid Express on-line bidding exchange at www.bidx.com until 09:30AM, May13, 2022. Bids will be opened at that time at the NDDOT building on the capitol grounds in Bismarck and the bid results will be distributed and posted online at https://www.dot.nd.gov/business/bidinfo.htm approximately 30 minutes after bids are opened. The proposal forms, plans, and specifications are available on the NDDOT website at http://www.dot.nd.gov and may be inspected at the Construction Services Division, 608 East Boulevard Avenue, Bismarck, North Dakota. All bidders not currently prequalified with NDDOT must submit an online Contractor’s Prequalification request to the Department at least ten (10) business days prior to the bid opening. The online application can be found on the NDDOT website at https://www.dot.nd.gov/business/contractors.htm NDDOT reserves the right to reject any and all proposals, waive technicalities, or to accept such as may be determined in the best interests of the state. For disability/language assistance, call 701-328-2978. Requested by: William T. Panos, Director North Dakota Department of Transportation (April 27, 2022) 55181