Article content Toronto, Ontario–(Newsfile Corp. – April 15, 2021) – Drilling continues to return significant PGE grades and widths including 47 meters at 2.3 g/t Palladium equivalent (“Pd_Eq”), (Hole LK21-061) at Kaukua South on the Läntinen Koillismaa (“LK”) PGE-Ni-Cu project in Finland, said Palladium One Mining Inc. (TSXV: PDM) (FSE: 7N11) (OTCQB: NKORF) (“Palladium One” or the “Company”) today. We apologize, but this video has failed to load. Try refreshing your browser. Palladium One Continues to Intersect Significant Widths at Kaukua South, Drills 47 Meters @ 2.3 g/t Pd_Eq Back to video Thus far, 46 holes have been drilled as part of the 17,500-meter Phase II Resource Definition drill program at Kaukua South, including today’s results, 29 have been released, while results for 17 holes are pending. The program’s goal has been to define the mineralization from surface to a depth of only 200 metres over the known 4-kilometer strike length of Kaukua South. In total 9,220 meters have been drilled to date as part of the Phase II program. Drilling is currently in hiatus for the spring thaw and is schedule to resume in mid-May.