Each harvesting pit is designed to be 12 feet in depth and five feet in width, with a capacity to store 400 litres of water during rainfall. The construction cost for one harvesting pit is approximately Rs 40,000; the BBMP estimates a total cost of Rs 4 crore for the construction of all harvesting pits.