S. Korea's first floating wind farm project passes prelimina

S. Korea's first floating wind farm project passes preliminary feasibility study


S. Korea's first floating wind farm project passes preliminary feasibility study
Lim Chang-won Reporter(cwlim34@ajunews.com) | Posted : May 6, 2021, 10:25 | Updated : May 6, 2021, 10:25
트위터 공유하기
A concept image shows a floating wind farm. [Courtesy of Korea National Oil Corp.]
SEOUL -- A pioneering project to generate electricity from South Korea's first floating wind farm in 2026 has finally passed a preliminary feasibility study conducted by a national think tank, almost three years after a state company moved first by installing equipment to measure wind energy at a useless offshore gas platform.
Korea National Oil Corp. (KNOC), which operates oil and gas fields, welcomed the green light from the Korea Development Institute (KDI) as a "significant starting point" for South Korea's energy transformation. "This is a significant starting point for great transformation from the era of carbon energy to clean energy," An Bum-hee, who heads KNOC's new growth project promotion team, said in a statement.

Related Keywords

Seoul , Soult Ukpyolsi , South Korea , Denmark , Kurop , Inch On Gwangyoksi , United Kingdom , Netherlands , Luxembourg , Incheon , Scotland , Korea , Danish , Van Oord , Posco , Korea National Oil Corp , Korea Development Institute , National Oil , President Moon Jae In , Jan De Nul , Kurop Island , Farm , Floating , Wind , Knoc , சியோல் , தெற்கு கொரியா , டென்மார்க் , ஒன்றுபட்டது கிஂக்டம் , நெதர்லாந்து , லக்ஸம்பர்க் , இன்செோன் , ஸ்காட்லாந்து , கொரியா , டேனிஷ் , வேன் ஊர்ட் , பொஸ்கோ , கொரியா தேசிய எண்ணெய் கார்ப் , கொரியா வளர்ச்சி நிறுவனம் , தேசிய எண்ணெய் , ப்ரெஸிடெஂட் நிலா ஜே இல் , பண்ணை , மிதக்கும் , காற்று ,

© 2025 Vimarsana