Troubled bridge replacement extends driver detours : vimarsa

Troubled bridge replacement extends driver detours


Troubled bridge replacement extends driver detours
April 25, 2021
FacebookTwitterEmail
CATAULA, Ga. (AP) — A bridge replacement gone awry is meaning a longer delay for drivers near Columbus.
Construction started in September 2019 on a replacement bridge on Fortson Road, south of Hamilton. The bridge closed in February 2020 and was supposed to reopen in mid-2020. The previous bridge was 62 years old and had serious structural problems.
But the Ledger-Enquirer reports the bridge isn't now projected to reopen until June, after Georgia Department of Transportation officials found the bridge's concrete deck wouldn't bear the required loads. The state instructed Baldwin Paving Co. of Marietta to remove and replace the deck.

Related Keywords

Standing Boy Creek , Georgia , United States , Harris County High School , Creekside , Lindsey Bader , Creekside Intermediate School , Baldwin Paving Co , Georgia Department Of Transportation , Georgia Department , Baldwin Paving , Penny Brooks , Standing Boy , Leader , Hamilton , Maa Bridge , Orth America Marietta Columbus , Marietta , Cataula , Fortson Road , P , C Complete State National , Ledger Enquirer , Covid , நின்று சிறுவன் க்ரீக் , ஜார்ஜியா , ஒன்றுபட்டது மாநிலங்களில் , ஹாரிஸ் கவுண்டி உயர் பள்ளி , க்ரீக்ஸைட் , க்ரீக்ஸைட் இடைநிலை பள்ளி , பால்ட்வின் நடைபாதை இணை , ஜார்ஜியா துறை ஆஃப் போக்குவரத்து , ஜார்ஜியா துறை , பால்ட்வின் நடைபாதை , பைசா ஓடை , நின்று சிறுவன் , அட்டௌஉல , ப் , விட் ,

© 2025 Vimarsana