Rochester council will review plans to address deficiencies in six downtown blocks and connected side streets. 6:30 am, Feb. 20, 2021 × Options for addressing nearly $1.7 million in sidewalk improvements along six downtown blocks of Broadway Avenue and connected portions of southwest First and Third streets will be discussed Monday. The topic is as part of the Rochester City Council’s 3:30 p.m. study session and will detail an estimated $632,000 shortfall in dedicated funding. The cost estimates do not include lighting upgrades, which would add at least $1 million to the work, or heated pathways to assist in snow removal, which is estimated to cost $1.3 million.