SFGTV April 3, 2014
Rest. Right. The Controllers Office has analyzed the cost and benefits and shows there is an overall savings of 40,000 per year on an on going basis. This is derived from 60,000 a year in regular salary savings. This is capturing a reduce in the over time in an allowing us to schedule a straight time rather than over time basis and there is a 20,000 cost associated with this because the shifts that are used up there are 12hour shifts because its a remote location and the type of job it is. The 12hour shifts dont lineup with our 80hour work weeks and this is a small amount of built in over time...