Delivering HS2's Old Oak Common station box | Construction News
The consortium digging out the box for HS2’s Old Oak Common station is operating on a grand scale Client: HS2 Ltd Contract value: £1.67bn (entire station)
Stay updated with breaking news from Bachy Soletanche. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The consortium digging out the box for HS2’s Old Oak Common station is operating on a grand scale Client: HS2 Ltd Contract value: £1.67bn (entire station)
The final piece of London's Thames Tideway Tunnel - a 1,200 tonne concrete lid - has been lifted into place.
Tideway has completed the construction of London’s ‘super sewer’, the Thames Tideway Tunnel, following the installation of the final lid piece.
The lifting of the 24m-wide lid at Abbey Mills Pumping Station marks the full completion of heavy civil engineering works for the project. Now this has
Amey, Morrison Utility Services, ISG, and Costain paying in under 20 days