In the maximum potential scenario, production would reach 7.9 tonnes per year, with an electrolysis capacity of 74.3 gigawatts. In the baseline scenario,
BarMar is part of the H2med project. The H2med project is composed of a hydrogen interconnection between Portugal and Spain (Celorico da Beira – Zamora) as